PWSA PAVING SCHEDULE
July 9 - July 13, 2018

PWSA PAVING SCHEDULE

July 9 – July 13, 2018

Pittsburgh, PA - The Pittsburgh Water and Sewer Authority (PWSA) contractors are scheduled to complete surface restoration, which includes paving and concrete work for the week of July 9, 2018. Many work locations will require restricted parking while work is being performed. Signs will be posted in advance and removed as soon as possible.

 

*Please note that the schedule is weather dependent and subject to change.

 

Work locations are as follows:

2675 South 18th Street
Winterburn Avenue at Alger Street
13 Brosville Street
843 Deely Street
1824 Saint Patrick Street
6309 Alderson Street
1705 Saint Patrick Street
214 Elysian Street
163 South 18th Street
1244 Album Street
1812 Harcum Way
 
1911 Harcum Way
 
South 19th Street at Harcum Way
 
Uxor Way at Sarah Street
 
20 South 14th Street
 
Blessing Street at Webster Avenue
 
3304 Iowa Street
 
936 Anaheim Street
 
711 Anaheim Street
 
767 Anaheim Street
 
727 Cherokee Street
 
Cherokee Street at Ossippee Street
 
2515 Elba Street
 
1200 Sarah Street
 
1200 Bellerock Street

 

 

*Any customer who needs additional information should call PWSA Emergency Dispatch 24/7 at 412.255.2423.

 

-=-

 