Search All Projects Find a project near you and learn about the latest updates with our interactive map search. Search Projects Featured Projects Water Reliability Plan Highland Reservoir Pump Station and Rising Main To modernize our water infrastructure and add redundancy and resiliency throughout our drinking water system, we will construct a new pump station and rising main in Highland Park. These projects will serve the Highland Reservoir service area. In Construction Stormwater South Side Park Stormwater Project This project will help to capture, store, and encourage infiltration of stormwater runoff in South Side Park. In Planning Contact Us 412-255-2423 Report an Emergency Press 1 Customer Service Press 5 Send us a Message Planning & Future Projects When PWSA's water mains, sewer pipes, and treatment facilities reach the end of their life, our team of engineers and project managers get to work designing and building new infrastructure. These projects are called "capital investments," and improve our water and sewer system for the long haul. Planning & Future Projects Overview Water Reliability Plan Aspinwall and Fox Chapel Interim Feed Project This design project will ensure safe and reliable drinking water for customers in the Borough of Aspinwall and Fox Chapel. In Planning Water Reliability Plan Clearwell Replacement The Clearwell is a 44-million gallon basin that plays a key role in the water treatment process. This component of the system is reaching the end of its useful life and must be replaced. The suite of Water Reliability Plan projects will lay the necessary groundwork to take the Clearwell offline. This project will replace the Clearwell structure with a new one, complete with bypasses and other modern fixtures to ensure reliable water service for the future. In Planning Completed Projects Water Lead Line Replacement Project - The Bluff PWSA will work in portions of The Bluff to replace all lead service lines found with a non-lead material. Completed Water Lead Line Replacement Project - Lincoln-Lemington-Belmar PWSA will work in portions of Lincoln-Lemington-Belmar to replace all lead service lines found with a non-lead material. Completed Common Issues & Questions Street & Sidewalk Restoration Storm Drains Report a Claim for Damages Water Main Breaks Sewage Backups Hydrants No Parking Water Discoloration Contact Us 412-255-2423 Report an Emergency Press 1 Customer Service Press 5 Send us a Message
Water Reliability Plan Highland Reservoir Pump Station and Rising Main To modernize our water infrastructure and add redundancy and resiliency throughout our drinking water system, we will construct a new pump station and rising main in Highland Park. These projects will serve the Highland Reservoir service area. In Construction
Stormwater South Side Park Stormwater Project This project will help to capture, store, and encourage infiltration of stormwater runoff in South Side Park. In Planning
Water Reliability Plan Aspinwall and Fox Chapel Interim Feed Project This design project will ensure safe and reliable drinking water for customers in the Borough of Aspinwall and Fox Chapel. In Planning
Water Reliability Plan Clearwell Replacement The Clearwell is a 44-million gallon basin that plays a key role in the water treatment process. This component of the system is reaching the end of its useful life and must be replaced. The suite of Water Reliability Plan projects will lay the necessary groundwork to take the Clearwell offline. This project will replace the Clearwell structure with a new one, complete with bypasses and other modern fixtures to ensure reliable water service for the future. In Planning
Water Lead Line Replacement Project - The Bluff PWSA will work in portions of The Bluff to replace all lead service lines found with a non-lead material. Completed
Water Lead Line Replacement Project - Lincoln-Lemington-Belmar PWSA will work in portions of Lincoln-Lemington-Belmar to replace all lead service lines found with a non-lead material. Completed