Lead Line Replacement Programs

Burham lslr

We will complete targeted lead service lines replacements with a prioritization model that removes lead in drinking water for our most vulnerable populations. 

Lead Service Line Replacement Approaches

Neighborhood Lead Line Replacement Projects: We target all lead lines in a geographic space, passing over non-lead service lines. When a private service line is made of lead, we will work with the property owner to replace the line at no direct cost. Learn more by visiting our Community Lead Response Program page.

Water Main + Lead Service Line Replacement: This annual program targets aging water mains that also show high concentrations of lead lines attached. You can read more about this program on our Water Construction Projects page.

We have also replaced lead lines at all daycare facilities within our water service area as part of our Priority Lead Line Replacement program in 2022.

To view all lead line replacement work and see what your service line is made of, visit our Lead Map.

What to Expect During a Lead Service Line Replacement

How is a service line replaced?

Typical service line layout

Crews will start the process by going to each property and inspecting the service line material at every property. This will help determine which sites have lead service lines that need replaced. 

If both a private and public lead service line is found at a property, the Lead Help Desk will reach out and set a coordination meeting with the property owner to discuss the replacement methods and schedule a replacement date. If a customer has a public lead service line, it will be replaced at no cost and no coordinate meeting is needed.

The next step of the process is to replace the lead service line with a non-lead material. We request that the property owner or a designated representative be present on this day. We will provide a lead pitcher filter and cartridges, as well as flushing instructions, after replacement. 

The final step of the project is restoration of streets and sidewalks. You can expect a delay between the completion of your service line replacement and restoration activities.

Daily Schedule for Lead Line and Small Diameter Water Main Replacement Projects

October 19, 2026

 

Small Diameter Water Main Replacements

Elliot and Crafton Heights 

  • 800 and 1000 blocks Steuben St
  • Steuben St and Wymore St
  • Steuben St (restoration) 
  • Wymore St (restoration)

West End

  • S Main St 
  • Woodville Ave and Minnotte Square 

Bloomfield

  • Liberty Ave (restoration)

Hazelwood

  • 5000 block Orinoco St 
  • 100 block Tecumseh St
  • Johnston Ave  

Troy Hill

  • Brabec St
  • Hatteras St 
  • Truax Way 

Neighborhood Lead Line Replacements

Oakland

  • Lawn St (restoration)
  • Niagara St (restoration)

Lincoln Lemington Belmar 

  • Navarro St (restoration)

South Side Slopes 

  • Cobden St (restoration)

Allegheny Center 

  • 900 block Western Ave 

Greenfield 

  • Farnsworth St (restoration)
  • Haldane St (restoration)
  • Lydia St (restoration)
  • Shields St (restoration)
  • Stanley St (restoration)

Squirrel Hill South 

  • Burchfield Ave (inspections) 
  • Shady Ave (inspections) 

East Liberty

  • 5800 block Hays St

Point Breeze

  • Brashear St (restoration)
  • Lloyd St (restoration)

Point Breeze North

  • 200 block N Homewood Ave 
  • 300 block N Lang Ave 
  • 6700 block Thomas Blvd 

Squirrel Hill North

  • Dunmoyle Ave (inspections) 
  • Fair Oaks St (inspections) 
  • S Negley Ave (inspections) 
  • Wightman St (inspections) 

Bloomfield

  • 4700 block Liberty Ave 
  • 500 and 600 blocks S Mathilda St  
  • 4800 block Yew St 

Highland Park 

  • 800 block Heberton St 
  • 6300 block Jackson St 
  • 1000 block Winterton St
  • Jackson St (inspections) 

 

Upcoming Lead Line Replacement Neighborhoods

In the next few months or so, we will begin lead service line replacements in portions of the following neighborhoods:

  • Bloomfield
  • Central Lawrenceville
  • Highland Park
  • Shadyside
Questions?

For lead service line replacement questions, contact the Lead Help Desk at 412-255-8987 or email LeadHelp@pgh2o.com.