Restoration

From the beginning of spring to the end of fall, Pittsburgh Water is actively paving hundreds of emergency repair sites and project locations. The information below provides an overview of where we’ll be each day to fully restore streets and sidewalks across our service area. 

Click Here for the Full Season Restoration List by Neighborhood

Daily Paving

Once Pittsburgh Water restores service following a water main break or service disruption, we come back to permanently pave the street or sidewalk. The following list shows where we’ll be each day to fully restore these sites. 

Schedule for 10/16/2026

  • 1806 Termon Ave
  • 3646 California Ave
  • 2626 N Charles St
  • 3839 California Ave
  • 2646 N Charles St 
  • 3963 Oswald St
  • 2703 Ellis St
  • 736 Maginn St
  • 2801 N Charles St 
  • 873 Marshall Ave
  • 2913 California Ave
  • 901 Benton Ave
  • 3181 Richardson St
  • Urbana Way and Davison St
  • 3203 Central Ave
  • W Burgess St and Perrysville Ave
  • 3506 Shadeland Ave
 

Daily Paving: Lead and Water Main Replacement Sites

Restoration is the final step of our lead service line and water main replacement projects. Once construction crews have completed all necessary work, paving crews come back to fully restore the project site. The following list shows where we’ll be each day to complete our work. 

Schedule for 10/19/2026

StreetNeighborhood
  • Steuben St 
  • Elliot and Crafton Heights
  • Wymore St
  • Elliot and Crafton Heights
  • Liberty Ave
  • Bloomfield
  • Lawn St
  • Oakland
  • Niagara St
  • Oakland
  • Navarro St
  • Lincoln Lemington Belmar 
  • Cobden St 
  • South Side Slopes 
  • Farnsworth St
  • Greenfield
  • Haldane St
  • Greenfield
  • Lydia St
  • Greenfield
  • Shields St 
  • Greenfield
  • Stanley St 
  • Greenfield
  • Brashear St 
  • Point Breeze 
  • Lloyd St 
  • Point Breeze 

About Paving and Restoration: Planned and Urgent Restorations

Crews paving roads

Restorations or paving after emergency repairs and planned construction projects do not always take place immediately after work is completed. Restorations are handled differently depending on the type of work we perform and the weather.

Asphalt crews and concrete crews work independently of each other. This means that it is not uncommon to see street paving and sidewalk replacement happening at different times.

In an effort to be as efficient as possible, we organize our projects by neighborhood so contractors do not need to move their materials and equipment across our service area on a daily basis. This reduces our costs and saves our ratepayers money. We appreciate your understanding and patience as we work to perform our work as quickly and responsibly as possible. Please see the restoration schedule above for current restoration location

Types of Restoration

Planned Construction

Street restorations for planned construction projects take place soon after the work is completed. These projects typically occur from spring through fall, when asphalt plants are open and concrete can set properly. 

Emergency Repairs

Water main breaks and sewer failures are common examples of emergency repairs. These unplanned events require that we dig into roadways and sidewalks. Sometimes this work occurs during the winter months, when asphalt plants are closed and temperatures are too low for larger areas of concrete and other materials to set properly.  After an emergency repair is made, the street and/or sidewalk will be either temporarily or permanently restored, depending on the time of year. We cannot provide permanent pavement restorations until temperatures are warmer in the spring through fall. 

Final Restoration

Completed in the warmer months, in spring through fall. Due to the high number of restoration sites, in part because of our aggressive lead service line replacement program, it may take several weeks before sites are restored permanently. Please note that the work is weather-dependent and subject to change.