Full Season Restoration Schedule by Neighborhood

*Note: Dates are subject to change for unforeseen factors, not limited to weather or changes to construction schedules

For specific locations within your neighborhood, please use our interactive Pittsburgh Water Construction GIS Map or visit our Construction home page

NeighborhoodsProjected Start and End Dates*
North Shore, Allegheny CenterMid-May - Early June
Chartiers City, Elliott, Esplen, Sheraden, West End, WestwoodLate May - Late May
Bedford Dwellings, Crawford–Roberts, Middle HillLate May - Early June
Central Oakland, South Oakland, West OaklandLate April - Mid May
Polish Hill, Upper Hill, Terrace VillageMid-May - Early June
Shadyside (part), North Oakland (part), Bloomfield (part)Mid-May - Early June
Friendship, Bloomfield (part), Garfield (part), Lawrenceville (Lower/Upper)Late April - Mid May
Point Breeze, North Point Breeze, Highland Park (part), East Liberty (part)Mid-May - Early June
East Liberty (part), Larimer, Homewood SouthLate April - Late May
Homewood North, Homewood West, Lincoln–Lemington–Belmar (part)Late April - Early June
Morningside, Highland Park (part), Stanton Heights (part)Late May - Early June
Lincoln–Lemington–Belmar (part), Lemington, BelmarLate May - Late June
Regent Square (Pittsburgh portion), Point Breeze North, Homewood area (portion)Early June - Late June
Squirrel Hill North, Squirrel Hill South, Regent Square (part), Point Breeze (part)Mid-April - Mid May
Greenfield, Hazelwood, Glen HazelMid-April - Early May
South Side Flats, South Side Slopes, ArlingtonEarly May - Late May
Allentown, Beltzhoover, Knoxville (part)Mid-May - Mid June
Carrick, Overbrook (part), Knoxville (part)Mid-May - Mid June
Beechview, Brookline, Bon Air (part), Mount Washington (part)Late May - Late June
Crafton Heights, Westwood (part), RidgemontLate May - Mid June
Spring Hill–City View, Spring Garden, Troy Hill, East Allegheny (Deutschtown)Early May - Late May
Strip District, Downtown (part), Polish Hill (part)Early May - Early May
Bluff (Uptown), South Shore, part of South SideEarly May - Early May
Perry North (Observatory Hill), Perry South, Northview HeightsEarly June - Late June
Manchester, ChateauLate April - Early June
Marshall–Shadeland (Brighton Heights area), California–KirkbrideMid-April - Late May
Brighton Heights (remaining areas), Marshall–Shadeland (part)Late April - Early June
BanksvilleLate May - Late May

Click Here for the Daily Surface Restoration Schedule

Click Here for the Daily Lead Line and Small Diameter Water Main Replacement Restoration Schedule

About Paving and Restoration

Crews paving roads

Restorations or paving after emergency repairs and planned construction projects do not always take place immediately after work is completed. Restorations are handled differently depending on the type of work we perform and the weather.

Asphalt crews and concrete crews work independently of each other. This means that it is not uncommon to see street paving and sidewalk replacement happening at different times.

In an effort to be as efficient as possible, we organize our projects by neighborhood so contractors do not need to move their materials and equipment across our service area on a daily basis. This reduces our costs and saves our ratepayers money. We appreciate your understanding and patience as we work to perform our work as quickly and responsibly as possible.

Types of Restoration

Planned Construction

Street restorations for planned construction projects take place soon after the work is completed. These projects typically occur from spring through fall, when asphalt plants are open and concrete can set properly. 

Emergency Repairs

Water main breaks and sewer failures are common examples of emergency repairs. These unplanned events require that we dig into roadways and sidewalks. Sometimes this work occurs during the winter months, when asphalt plants are closed and temperatures are too low for larger areas of concrete and other materials to set properly.  After an emergency repair is made, the street and/or sidewalk will be either temporarily or permanently restored, depending on the time of year. We cannot provide permanent pavement restorations until temperatures are warmer in the spring through fall. 

Final Restoration

Completed in the warmer months, in spring through fall. Due to the high number of restoration sites, in part because of our aggressive lead service line replacement program, it may take several weeks before sites are restored permanently. Please note that the work is weather-dependent and subject to change.