Lead Line Replacement Programs

Burham lslr

We will complete targeted lead service lines replacements with a prioritization model that removes lead in drinking water for our most vulnerable populations. 

Lead Service Line Replacement Approaches

Neighborhood Lead Line Replacement Projects: We target all lead lines in a geographic space, passing over non-lead service lines. When a private service line is made of lead, we will work with the property owner to replace the line at no direct cost. Learn more by visiting our Community Lead Response Program page.

Water Main + Lead Service Line Replacement: This annual program targets aging water mains that also show high concentrations of lead lines attached. You can read more about this program on our Water Construction Projects page.

We have also replaced lead lines at all daycare facilities within our water service area as part of our Priority Lead Line Replacement program in 2022.

To view all lead line replacement work and see what your service line is made of, visit our Lead Map.

What to Expect During a Lead Service Line Replacement

How is a service line replaced?

Typical service line layout

Crews will start the process by going to each property and inspecting the service line material at every property. This will help determine which sites have lead service lines that need replaced. 

If both a private and public lead service line is found at a property, the Lead Help Desk will reach out and set a coordination meeting with the property owner to discuss the replacement methods and schedule a replacement date. If a customer has a public lead service line, it will be replaced at no cost and no coordinate meeting is needed.

The next step of the process is to replace the lead service line with a non-lead material. We request that the property owner or a designated representative be present on this day. We will provide a lead pitcher filter and cartridges, as well as flushing instructions, after replacement. 

The final step of the project is restoration of streets and sidewalks. You can expect a delay between the completion of your service line replacement and restoration activities.

Daily Schedule for Lead Line and Small Diameter Water Main Replacement Projects

August 17, 2026

 

Small Diameter Water Main Replacements

Elliot and Crafton Heights

  • 900 block Amherst St 
  • 1000 block Chartiers Ave 
  • 1100 block Fredonia St 
  • Marlow St and Ainsworth St 
  • Marlow St and Finch St
  • Steuben St
  • Weston Way 
  • Lorenz Ave (restoration) 
  • Strahley Pl (restoration) 

Bloomfield

  • 200 block Sapling Way 
  • 200 block Taylor St 
  • Friendship Ave and Taylor St 
  • Friendship Ave and Torley St 
  • Friendship Ave 
  • Liberty Ave 

Hazelwood

  • Gertrude St 
  • Mansion St (inspections) 
  • Winston St (inspections) 

Troy Hill

  • Lowrie St 
  • Goettman St (inspections) 

Neighborhood Lead Line Replacements

Upper Hill 

  • Adelaide St (restoration)

Oakland

  • Atwood St (restoration)
  • Bigelow Blvd (restoration)

Lincoln Lemington Belmar 

  • 6600 block Hedge St 
  • 1200 block Pointview St 

South Side Slopes

  • 2000 block Arlington Ave 
  • 2400 block Eccles St 
  • Greeley St 
  • Kosciusko Wy
  • Eccles St (restoration)
  • Barry St (inspections) 
  • Oakley St (inspections) 

Marshall Shadeland 

  • Colorado St (restoration)
  • McCook St (restoration)
  • Toner St (restoration)

Greenfield

  • 4200 and 4300 blocks Gladstone St  
  • 300 block Ivondale St 
  • 4100 block Stanley St 
  • Blanton St (restoration)
  • Minnesota St (restoration)

Polish Hill

  • Melwood Ave (restoration)

East Liberty 

  • 600 block Chislett St 
  • Stanton Ave (inspections) 

Larimer 

  • 6600 block Frankstown Ave 

Point Breeze

  • 500 and 600 blocks S Lang Ave 
  • Lloyd St (inspections) 
  • S Lang Ave (inspections) 

 

Upcoming Lead Line Replacement Neighborhoods

In the next few months or so, we will begin lead service line replacements in portions of the following neighborhoods:

  • Bloomfield
  • Central Lawrenceville
  • Highland Park
  • Shadyside
Questions?

For lead service line replacement questions, contact the Lead Help Desk at 412-255-8987 or email LeadHelp@pgh2o.com