Lead Line Replacement Programs

Burham lslr

We will complete targeted lead service lines replacements with a prioritization model that removes lead in drinking water for our most vulnerable populations. 

Lead Service Line Replacement Approaches

Neighborhood Lead Line Replacement Projects: We target all lead lines in a geographic space, passing over non-lead service lines. When a private service line is made of lead, we will work with the property owner to replace the line at no direct cost. Learn more by visiting our Community Lead Response Program page.

Water Main + Lead Service Line Replacement: This annual program targets aging water mains that also show high concentrations of lead lines attached. You can read more about this program on our Water Construction Projects page.

We have also replaced lead lines at all daycare facilities within our water service area as part of our Priority Lead Line Replacement program in 2022.

To view all lead line replacement work and see what your service line is made of, visit our Lead Map.

What to Expect During a Lead Service Line Replacement

How is a service line replaced?

Typical service line layout

Crews will start the process by going to each property and inspecting the service line material at every property. This will help determine which sites have lead service lines that need replaced. 

If both a private and public lead service line is found at a property, the Lead Help Desk will reach out and set a coordination meeting with the property owner to discuss the replacement methods and schedule a replacement date. If a customer has a public lead service line, it will be replaced at no cost and no coordinate meeting is needed.

The next step of the process is to replace the lead service line with a non-lead material. We request that the property owner or a designated representative be present on this day. We will provide a lead pitcher filter and cartridges, as well as flushing instructions, after replacement. 

The final step of the project is restoration of streets and sidewalks. You can expect a delay between the completion of your service line replacement and restoration activities.

Daily Schedule for Lead Line and Small Diameter Water Main Replacement Projects

October 14, 2026

 

Small Diameter Water Main Replacements

Elliot and Crafton Heights 

  • Steuben St
  • Herschel St and Bengal Way (restoration) 
  • Wymore St (restoration)

West End

  • McCartney St 
  • Wabash St and Minnotte Square 
  • Warden St 

Bloomfield

  • Friendship Ave (restoration)
  • Liberty Ave (restoration)

Lower Lawrenceville    

  • Denny St (restoration) 

Hazelwood

  • 4900 block Gertrude St
  • 100 block Glen Caladh St
  • 5000 block Orinoco St 
  • Johnston Ave  

Troy Hill

  • Brabec St
  • Heckleman St 
  • Truax Way 

Neighborhood Lead Line Replacements

Oakland

  • Juliet St (restoration)

Lincoln Lemington Belmar 

  • Dean St (restoration)
  • Dunmore St (restoration)
  • Paulson Ave (restoration)

South Side Slopes

  • Arlington Ave (restoration)
  • Cologne St (restoration)
  • Patterson St (restoration)
  • Salisbury St (restoration)

Allegheny Center 

  • 900 block Western Ave 

Greenfield 

  • Alger St (restoration)
  • Blanton St (restoration)
  • Connor St (restoration)
  • Kaercher St (restoration)
  • Stanley St (restoration)
  • Winterburn Ave (restoration)
  • Yoder St (restoration)

Squirrel Hill South 

  • 2700 block Beechwood Blvd (inspections)
  • Burchfield Ave (inspections) 

East Liberty

  • 5600 block Stanton Ave

Point Breeze

  • 100 block S Braddock Ave 
  • Lloyd St (restoration)
  • Reynolds St (restoration)
  • S Dallas Ave (restoration)
  • S Braddock Ave (inspections)

Point Breeze North

  • 7200 block Meade St 
  • 200 block N Lang Ave 

Squirrel Hill North

  • Maple Heights Ct (inspections) 
  • S Negley Ave (inspections) 

Bloomfield

  • 4800 and 4900 blocks Cypress St 
  • 4900 block Sciota St 
  • Osceola St (inspections) 

Highland Park 

  • 6300 block Glenview Pl 
  • 800 block Heberton St 
  • 6300 block Jackson St (inspections) 

 

Upcoming Lead Line Replacement Neighborhoods

In the next few months or so, we will begin lead service line replacements in portions of the following neighborhoods:

  • Bloomfield
  • Central Lawrenceville
  • Highland Park
  • Shadyside