Daily Surface Restoration Schedule

Schedule for 6/23/2026

  • 100 Handler St
  • 103 S 21st St
  • 116 23rd St
  • 1201 McAnulty St
  • 1323 Paulson Ave
  • 1352 Missouri St
  • 1515 Colwell St
  • 1601 Lincoln Ave
  • 1606 Colwell St
  • 1640 Colwell St
  • 165 45th St
  • 1718 Tustin St
  • 1816 Locust St
  • 1901 Liberty Ave
  • 197 Cotton Way
  • 21 Greely St
  • 2217 Sarah St
  • 2227 Jane St
  • 236 N Graham St
  • 245 45th St
  • 249 Main St
  • 24th St and Sarah St
  • 265 Main St
  • 270 46th St
  • 2800 Sarah St
  • 2806 Sarah St
  • 2900 Sarah St
  • 2930 Harcum Way
  • 31 Eleanor St
  • 3126 Jane St
  • 3137 Josephine St
  • 332 44th St
  • 345 46th St
  • 358 42nd St
  • 40 S 28th St
  • 4022 Arsenal Pl
  • 409 McAnulty St
  • 509 Ridgemont Dr
  • 526 Springfield St
  • 5444 Hampton St
  • 5446 Black St
  • 5485 Hays St
  • 5642 Hampton St
  • 612 Chislett St
  • 626 N Sheridan Ave
  • 6355 Apple St
  • 64 Woodville Ave
  • 6445 Navarro St
  • 6487 Jackson St
  • 6528 Apple St
  • 6870 Susquehanna St
  • 6907 Wiltsie St
  • 7021 Lemington Ave
  • 7024 Lemington Ave
  • 731 Lime St
  • Greentree Rd and Junius St
  • Primrose St and Sterling St
  • S 14th St and Carson St
  • Stevenson St and Vickroy St
  • Watson St and Marion St

Click Here for the Daily Lead Line and Small Diameter Water Main Replacement Restoration Schedule

Click Here for the Full Season Restoration List by Neighborhood

About Paving and Restoration: Planned and Urgent Restorations

Crews paving roads

Restorations or paving after emergency repairs and planned construction projects do not always take place immediately after work is completed. Restorations are handled differently depending on the type of work we perform and the weather.

Asphalt crews and concrete crews work independently of each other. This means that it is not uncommon to see street paving and sidewalk replacement happening at different times.

In an effort to be as efficient as possible, we organize our projects by neighborhood so contractors do not need to move their materials and equipment across our service area on a daily basis. This reduces our costs and saves our ratepayers money. We appreciate your understanding and patience as we work to perform our work as quickly and responsibly as possible. Please see the restoration schedule above for current restoration location

Types of Restoration

Planned Construction

Street restorations for planned construction projects take place soon after the work is completed. These projects typically occur from spring through fall, when asphalt plants are open and concrete can set properly. 

Emergency Repairs

Water main breaks and sewer failures are common examples of emergency repairs. These unplanned events require that we dig into roadways and sidewalks. Sometimes this work occurs during the winter months, when asphalt plants are closed and temperatures are too low for larger areas of concrete and other materials to set properly.  After an emergency repair is made, the street and/or sidewalk will be either temporarily or permanently restored, depending on the time of year. We cannot provide permanent pavement restorations until temperatures are warmer in the spring through fall. 

Final Restoration

Completed in the warmer months, in spring through fall. Due to the high number of restoration sites, in part because of our aggressive lead service line replacement program, it may take several weeks before sites are restored permanently. Please note that the work is weather-dependent and subject to change.