PWSA Project No.: 2017-322-101-5
Status: Closed
Proposal Due Date: August 13, 2020 at 2:00 PM
Description: PWSA is requesting bids for addressing wiring/conduits for water heaters/flow switches, and new breakers throughout the Aspinwall Water Treatment Plant. The Work includes, but is not limited to, the following:
1. Installation of electrical wiring and conduits to instantaneous water heaters and flow switches.
2. Installation of new breakers in various panels.