Braywood Way Stormwater Improvements Project

In Planning Stormwater

In partnership with the City of Pittsburgh, we are planning a stormwater and roadway improvements project to address flooding issues at Braywood Way in the Greenfield and Hazelwood neighborhoods.

Progress & Status

90%
Design Complete

PWSA's project team provided two virtual presentations with residents so far in the design process: 

The project area is located in the M-29 sewershed, one of the largest contributors to combined sewer overflows (CSOs) into rivers in the Pittsburgh region. Therefore, stormwater detention and/or green infrastructure measures will be prioritized during design.

Project Components

  • Design and install infrastructure to help manage stormwater flows that are impacting private properties, the roadway, and the Monongahela River via CSOs
  • Prioritize stormwater detention and/or other green infrastructure systems where peak flows from the watershed can potentially be captured and managed
  • Design and install roadway improvements to enhance both road surface quality and drainage

Locations & Schedule

Location Details:
Greenfield and Hazelwood neighborhoods

Start Date: Design expected complete Spring 2024, construction to begin late summer 2024

Completion Date: TBD

Map showing the location of Braywood Way at the border of Greenfield and Hazewood neighborhoods.

Braywood Way
Pittsburgh, PA 15217
United States

Project Contacts

If you have questions, please contact the Project Manager

Project Manager :
Maria Natoli
412-255-8800 ext 2604
mnatoli@pgh2o.com