In partnership with the City of Pittsburgh, we are planning a stormwater and roadway improvements project to address flooding issues at Braywood Way in the Greenfield and Hazelwood neighborhoods.
Progress & Status
PWSA's project team provided a virtual presentation on July 24th. Click here to view the presentation.
The project area is located in the M-29 sewershed, one of the largest contributors to combined sewer overflows (CSOs) into rivers in the Pittsburgh region. Therefore, stormwater detention and/or green infrastructure measures will be prioritized during design.
Project Components
- Design and install infrastructure to help manage stormwater flows that are impacting private properties, the roadway, and the Monongahela River via CSOs
- Prioritize stormwater detention and/or other green infrastructure systems where peak flows from the watershed can potentially be captured and managed
- Design and install roadway improvements to enhance both road surface quality and drainage
Locations & Schedule
Location Details:
Greenfield and Hazelwood neighborhoods
Start Date: Design started Summer 2022. Construction expected to start Spring 2024.
Completion Date: Design expected complete Winter 2023.